Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.
-
I've just got back from setting up for tonights party and my fingers feel like they're going to fall off.
It took me 2.5hrs to set up in freezing conditions. I took a photo of the empty barn and will try and take some more tonight if I can of everything in full swing. I had 3 Great Danes milling about too but they are really cool.
It's supposed to be around -8 tonight so it will be interesting to say the least. They have 3 big industrial heaters there so that should be ok.
I've put in the following:
4ft Ultimax Stand with Starcloth
Denon HD2500
Laptop with VDJ and Controller
Crown XLS802 Amplifier
2 x JLB JRX125
2 x Peavey Pro Subs (haven't got my new ones yet)
2 x Mackie SRM450 V2 (connected via Master 2 on Mixer)
2 x ADJ Megabar (on top of speaker stack)
2 x ADJ Starballs
2 x Revo 3's
2 x Martin EFX2
4 x Kam RGB192 Led Panels
1 x Smoke Machine
I couldn't even gaffa down leads as the tape wouldn't stick to the floor!
-
-
-
I feel very sorry for all the ireland fans who travelled to Paris for the rugby.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules