yourdj
04-04-2010, 02:07 AM
Hi,
Im no expert and I have nothing on quite a few of people on here :p
I have taken allot from this forum so I like to give back when i can :)
I have tweaked my kit over the last few years to arrive at a venue and set up in
minimum time possible without limiting performance quality. At a real flap i have
done it in about 15 mins from arriving at the venue, but generally i would rather
take my time so its about 30 mins with good access and NO STAIRS :p
The following pics show my set up which is not a massive rig but i tend to do
Newforest venues and the clients who pick me often ask if i am going to have
loads of gear everywhere and like the simple approach.
I have:
- 2 subs (smartsound)
- 2 RCF tops
- Amprack with four channel T.AMP (very light)
- Vestax and mac with flightcase - holds mics too.
- TBAR - impossiled, 2 triphase, 2 laser - (need one more light and control).
- 5 (poss 6 if packed right) LED par cans - although i have 6 more in the trailer if required.
- Accessories & power cables
For those who like/need lots of equipment and booths you could double up this and
make it two trips and double the set up which is still impressive.
You could easily fit that in my trailer as you can see in the pic. :)
STAIRS ARE A PAIN IN THE BUM THOUGH. But 95% of my venues do not have them.
Not exactly a genius idea but Rob asked in another post so I would I would post this :)
http://3.bp.blogspot.com/_044PTfUkGaA/S7f1WbkY28I/AAAAAAAACSQ/LLSgSOKcaNY/s320/full+set+up.jpg
http://3.bp.blogspot.com/_044PTfUkGaA/S7ft0HDdFyI/AAAAAAAACRM/piO-DsUdakQ/s320/IMG_4171.jpg
http://1.bp.blogspot.com/_044PTfUkGaA/S7fvm-ywEyI/AAAAAAAACRw/XZNtjnt486Q/s320/gear+transport+1.jpg
http://4.bp.blogspot.com/_044PTfUkGaA/S7fvnrE87DI/AAAAAAAACR4/aq_amiH7TtU/s320/gear+transport+2.jpg
http://2.bp.blogspot.com/_044PTfUkGaA/S7fvoLHQklI/AAAAAAAACSA/QdGxtZcpDFg/s320/gear+transport+3.jpg
Forgot too add that all the gear is used as a stand with some blackout.
Only thing not utilized is the speaker cases and amp-rack ends.
You can also get up small steps within 0.5m high and same long.
you need to be strong though to lift this though.
:)
Im no expert and I have nothing on quite a few of people on here :p
I have taken allot from this forum so I like to give back when i can :)
I have tweaked my kit over the last few years to arrive at a venue and set up in
minimum time possible without limiting performance quality. At a real flap i have
done it in about 15 mins from arriving at the venue, but generally i would rather
take my time so its about 30 mins with good access and NO STAIRS :p
The following pics show my set up which is not a massive rig but i tend to do
Newforest venues and the clients who pick me often ask if i am going to have
loads of gear everywhere and like the simple approach.
I have:
- 2 subs (smartsound)
- 2 RCF tops
- Amprack with four channel T.AMP (very light)
- Vestax and mac with flightcase - holds mics too.
- TBAR - impossiled, 2 triphase, 2 laser - (need one more light and control).
- 5 (poss 6 if packed right) LED par cans - although i have 6 more in the trailer if required.
- Accessories & power cables
For those who like/need lots of equipment and booths you could double up this and
make it two trips and double the set up which is still impressive.
You could easily fit that in my trailer as you can see in the pic. :)
STAIRS ARE A PAIN IN THE BUM THOUGH. But 95% of my venues do not have them.
Not exactly a genius idea but Rob asked in another post so I would I would post this :)
http://3.bp.blogspot.com/_044PTfUkGaA/S7f1WbkY28I/AAAAAAAACSQ/LLSgSOKcaNY/s320/full+set+up.jpg
http://3.bp.blogspot.com/_044PTfUkGaA/S7ft0HDdFyI/AAAAAAAACRM/piO-DsUdakQ/s320/IMG_4171.jpg
http://1.bp.blogspot.com/_044PTfUkGaA/S7fvm-ywEyI/AAAAAAAACRw/XZNtjnt486Q/s320/gear+transport+1.jpg
http://4.bp.blogspot.com/_044PTfUkGaA/S7fvnrE87DI/AAAAAAAACR4/aq_amiH7TtU/s320/gear+transport+2.jpg
http://2.bp.blogspot.com/_044PTfUkGaA/S7fvoLHQklI/AAAAAAAACSA/QdGxtZcpDFg/s320/gear+transport+3.jpg
Forgot too add that all the gear is used as a stand with some blackout.
Only thing not utilized is the speaker cases and amp-rack ends.
You can also get up small steps within 0.5m high and same long.
you need to be strong though to lift this though.
:)