NKR
19-09-2011, 09:02 PM
Mucho tired today.
After getting the gear to bed at 2:00am on Sunday morning we were back up and at it at a wedding Fayre at the Blackpool Hilton on site at 8:30am.
2 hours setting up catwalk lighting consisting of 4 LEDJ Omni Tri9's, 4 Martin MX4's and 4 big powerdrive winch stands. About 60 meters of dmx cable run around the room and and a whole load of duct tape employed.
It went really well and spoke to loads of folks.
Just taken a booking for 2013 off the back of it from a phone call this evening and already had a couple of other e-mails.
Roll on the next ones and roll on having a free stand. The power of supplying free catwalk lighting.
Its all good fun.
After getting the gear to bed at 2:00am on Sunday morning we were back up and at it at a wedding Fayre at the Blackpool Hilton on site at 8:30am.
2 hours setting up catwalk lighting consisting of 4 LEDJ Omni Tri9's, 4 Martin MX4's and 4 big powerdrive winch stands. About 60 meters of dmx cable run around the room and and a whole load of duct tape employed.
It went really well and spoke to loads of folks.
Just taken a booking for 2013 off the back of it from a phone call this evening and already had a couple of other e-mails.
Roll on the next ones and roll on having a free stand. The power of supplying free catwalk lighting.
Its all good fun.